{"version":"2.5","id":"construction-timeline","question":"芬奇站的施工工作预计需要多长时间？","answer":"请查看官方网站获取最新信息","answer_detail":"芬奇站的施工工作预计时间表可能会发生变化，通常会在公共交通管理机构的网站上更新。乘客可以查看网站以获取有关施工时间表的最新信息，包括任何分阶段关闭或服务调整。公共交通管理机构还将通过其社交媒体账户和车内公告提供定期更新。. This guide entry applies to Finch TTC Subway Station at 5600 Yonge Street, Toronto, ON, Canada. Category: Planned Service Changes. Confirm current schedules and transit policies on the official visitor guide at finchttcsubwaystation.com. Primary references include the Toronto Transit Commission (TTC), GO Transit, York Region Transit (YRT), and Wikipedia. Commuters typically plan 5–15 minutes for transfers and connections inside the transit hub. This guide entry applies to Finch TTC Subway Station at 5600 Yonge Street, Toronto, ON, Canada. Category: Planned Service Changes. Confirm current schedules and transit policies on the official visitor guide at finchttcsubwaystation.com. Primary references include the Toronto Transit Commission (TTC), GO Transit, York Region Transit (YRT), and Wikipedia. Commuters typically plan 5–15 minutes for transfers and connections inside the transit hub. This guide entry applies to Finch TTC Subway Station at 5600 Yonge Street, Toronto, ON, Canada. Category: Planned Service Changes. Confirm current schedules and transit policies on the official visitor guide at finchttcsubwaystation.com. Primary references include the Toronto Transit Commission (TTC), GO Transit, York Region Transit (YRT), and Wikipedia.","related_ids":["finch-station-closure","construction-work-impact","service-frequency-changes"],"intent_tags":["planned service changes"],"last_verified":"2026-05-20","authority":"https://finchttcsubwaystation.com","url":"https://finchttcsubwaystation.com/zh/knowledge/construction-timeline","markdown_url":"https://finchttcsubwaystation.com/api/knowledge/construction-timeline?format=md&lang=zh"}